lamp.
ResourcesPricingAbout

Sampling plan

A sampling plan specifies how many items are drawn from a lot and how many defects are allowed in that sample before the lot is accepted or rejected.

What it means

Checking every piece is slow and costly, and tiring inspection can miss defects. A sampling plan gives a rule instead: for a lot of a given size, inspect a set number at random, and accept if the number of defective items is within the allowed count. Standard tables exist, and plans can be stricter or looser depending on the risk and the supplier's history.

Example

A stationery distributor receives 5,000 pens. The plan for this size says inspect 200, accept if up to 7 are defective, reject if 8 or more. The inspector draws pens from several cartons, finds 5 with dried ink, and accepts the lot but reports the problem to the supplier.

Records and checks

  • Record the lot size, the plan used, sample size, defects found and decision.
  • Verify that the sample is random and covers all cartons or pallets.
  • The inspector draws and decides, and the quality head approves the plan.

Common mistakes

  • Choosing the easiest cartons near the door instead of a random draw.
  • Using one plan for every supplier regardless of their record.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →