Scrap rate
Scrap rate is the percentage of input material or finished pieces that become unusable waste during production, usually measured per job, shift or month.
What it means
You calculate it by dividing the quantity scrapped by the total quantity started or produced, then multiplying by 100. Some firms count scrap by weight of material, others by number of pieces. Pick one method and stay with it, otherwise month-to-month comparison means nothing.
Example
A plastic moulding unit runs 8,000 caps in a shift and 320 are rejected as short shots. The scrap rate is 4 percent. At ₹2.50 of material per cap, that shift lost about ₹800 in resin alone, before counting machine time.
Records and checks
- Record the quantity scrapped, the reason code, the machine and the operator or shift for every rejection.
- Verify that the scrap bin count matches the quantities booked against the job.
- The supervisor reviews daily figures, and the plant head reviews the trend with the top three reasons weekly.
Common mistakes
- Counting only finished-piece scrap and ignoring offcuts, start-up pieces and trial runs.
- Throwing scrap out without weighing or counting it, which makes the rate look better than it is.