lamp.
ResourcesPricingAbout

Shearing

Shearing is a cutting process that separates sheet or plate in a straight line by forcing it between two opposed blades.

What it means

A guillotine shear holds the sheet, then a moving upper blade passes the fixed lower blade to cut it. It makes straight-edged blanks quickly and with almost no material lost to kerf, which makes it ideal for rectangular pieces before bending or laser cutting. The blade gap must suit the thickness, or the edge will burr or roll over.

Example

A cabinet maker shears forty 1,200 x 600 mm blanks from a 2,500 x 1,250 mm sheet of 2 mm CRCA, using a back gauge to set the width.

Records and checks

  • Record the material, thickness, blank size, quantity and the blade gap or last blade sharpening date.
  • Verify the first blank's length, width and squareness before shearing the full lot.
  • The operator checks as the run proceeds, and the maintenance lead sharpens or replaces blades as needed.

Common mistakes

  • Shearing sheet thicker than the machine's rated capacity, which damages the blades.
  • Setting the back gauge off the wrong edge so the whole lot is cut slightly out of square.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →