Single sourcing

Single sourcing is a deliberate choice to buy a particular item from only one supplier, even though other suppliers could provide it.

What it means

It is not the same as having one supplier because no one else makes the item. A firm may single-source to win a better price on volume, keep tight quality control, or because the supplier holds its tooling. The cost is risk: if that supplier has a fire, strike or cash crisis, production can stop.

Example

A pump assembler buys all machined shafts from one workshop at ₹410 each, instead of splitting orders with two others at ₹435. The saving is steady, but when the workshop shuts for three weeks, the assembler has no approved second source and delays eleven customer orders.

Records and checks

  • Record which items are single-sourced, the reason, and the supplier's stock and lead time.
  • Verify the supplier's financial health and capacity at least once a year.
  • The purchase head reports the risk, and the owner decides whether a backup is needed.

Common mistakes

  • Letting single sourcing happen by habit, so nobody has measured the risk.
  • Keeping no second source qualified for critical items.