Site instruction
A site instruction is a written direction issued by the client, architect or project manager to the contractor to carry out, change, stop or clarify work at the site.
What it means
Instructions are often given verbally while walking the site. Written ones turn those directions into a record. Some are routine clarifications, but others change the scope, cost or time, in which case the contractor should flag the impact before acting. The instruction number and date link it to later variation orders or claims.
Example
The architect tells the plumbing contractor to move a floor drain 600 mm inside the bathroom. The contractor receives a numbered instruction, SI-07, notes that tiles already laid must be cut and records the extra ₹9,500 estimate before starting.
Records and checks
- Record instruction number, date, issuer, receiver, the exact direction and any drawing revision referred to.
- Verify whether it changes cost or time, and raise the impact in writing within the contract's notice period.
- The site engineer logs it and the project manager decides whether it needs a variation order.
Common mistakes
- Acting on an oral instruction and finding later that the client denies giving it.
- Filing instructions in a folder without linking them to the cost of the resulting extra work.