Skill certification
A formal credential, issued after a test or course, confirming that a person can perform a defined skill to a stated standard.
What it means
It is independent evidence of competence: a certificate from an industrial training institute, a sector skill council, a machine maker or an in-house test. Some jobs, such as electrical work or crane operation, may require a valid certificate before a worker is allowed on the task. Certificates can expire, so the firm needs to track when they must be renewed.
Example
A fabricator holds a welding certificate valid till March 2027. When it expires the unit has to send him for a re-test, costing ₹3,000, before he can be rostered for pressure-vessel jobs.
Records and checks
- Record the skill, issuer, certificate number, issue date and expiry date, with a scanned copy.
- Verify the certificate with the issuer for safety-critical roles and watch the expiry date.
- HR holds the file and the safety officer checks the match with job assignment.
Common mistakes
- Accepting a photocopy without verifying it for a safety-critical trade.
- Missing expiry dates, so a person works on a task they are no longer certified for.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →