lamp.
ResourcesPricingAbout

Skills assessment

A structured check of what a person can actually do, by practical test, observation or scored questions, used for hiring, grading and training.

What it means

It replaces opinion with evidence. For a lathe operator it may mean cutting a sample part to tolerance. For an accounts clerk it may be a short test of posting entries and bank reconciliation. The results rate people against the level the role demands, show training gaps and support grading and pay decisions. The same test should be used for every person for the same role.

Example

A fastener maker tests six candidates on reading a drawing and measuring a part with a vernier. Two score above 8 out of 10 and are shortlisted, and the lowest scorer's gap in drawing reading is noted for a training plan.

Records and checks

  • Record the test used, date, the score for each skill and the assessor's name.
  • Verify that the test reflects real job tasks and was marked the same way for all.
  • A senior in the trade assesses and HR files the result.

Common mistakes

  • Using a different test for each person, which makes the scores incomparable.
  • Assessing only theory when the job is hands-on.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →