lamp.
ResourcesPricingAbout

SKU penetration

SKU penetration is the share of a company's listed product variants, or SKUs, that a given outlet or area actually stocks.

What it means

A brand may sell twelve SKUs, such as three flavours in four pack sizes, but a typical shop stocks only five. SKU penetration is then five out of twelve, or about 42 percent. It reveals missed sales: shops that buy the brand but ignore its slower or newer lines. Raising it means convincing shops to take more of the range, usually by promoting the products with the best margin.

Example

A biscuit distributor in Bareilly lists ten SKUs from a brand. An audit of 50 shops finds an average of four in stock. SKU penetration is 40 percent. The salesman targets six per shop by adding two mid sized packs.

Records and checks

  • Record each shop's stocked SKUs against the master list at each audit.
  • Verify the SKU list is current, removing discontinued items so that the percentage is not unfairly low.
  • The area manager reviews SKU penetration by beat and picks the top two missing SKUs to push.

Common mistakes

  • Pushing every slow SKU into shops and creating expiry returns.
  • Counting a SKU as present when the shop has a single dusty unit.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →