Sprue

The sprue is the main entry channel in an injection mould, through which molten plastic passes from the machine nozzle into the runners and cavities.

What it means

It is the first stretch of the flow path, a tapered hole that lets the cold sprue be pulled free when the mould opens. In a cold-runner mould the plastic that sets in the sprue comes out with the shot and is either snapped off, or ground and reused. Its length and diameter matter: a long, thick sprue wastes material and cooling time, while a thin one may freeze early.

Example

A small moulder finds that its sprue is 60 mm long and weighs 9 g on a part that weighs only 5 g. A shorter sprue bush of 35 mm cuts it to 5 g, saving 4 g a shot, which is 400 kg a year over 1 lakh shots a month.

Records and checks

  • Record the sprue length, diameter, weight per shot and the sprue bush fitted on each mould.
  • Verify that the bush seats well against the nozzle and that the sprue releases cleanly from the mould.
  • The tool room fits and checks the bush, the operator reports sticking, and the planner includes the sprue in material costing.

Common mistakes

  • Using a standard long sprue on a small mould, wasting resin and cooling time on every shot.
  • Letting a damaged sprue bush leak plastic at the nozzle, which causes flash and downtime.