Standard operating procedure

A standard operating procedure, or SOP, is a written step-by-step method for carrying out a recurring process the same way every time, by whoever is doing it.

What it means

It covers a whole process, such as receiving goods or approving a supplier payment, and states who does each step, in what order, with which records. It protects quality when staff change and makes training faster. A good SOP is short, uses simple words and is kept where the work is done. A work instruction goes deeper into how to do one step.

Example

A packaged-water plant has an SOP for goods receipt: the guard logs the vehicle, the store checks quantity against the purchase order, quality inspects a sample, and the storekeeper issues a receipt note. Any shortfall is reported to purchase the same day.

Records and checks

  • Record: SOP title, steps, responsible roles, forms used, version number, approver and date.
  • Verify: by watching the work being done that staff actually follow the written steps.
  • Checked by: the process owner reviews it yearly; the owner approves the final version.

Common mistakes

  • Writing it in a way nobody can follow on the shop floor.
  • Never updating it after the process changes, so staff ignore it.