Supplier scorecard

A supplier scorecard is a periodic rating of a supplier on set measures such as quality, delivery, price and responsiveness.

What it means

It turns scattered impressions into numbers that can be compared. Each measure is weighted by importance, for example quality 40, delivery 30, price 20 and service 10. Scores are reviewed with the supplier and guide who gets the larger share of orders. Figures should come from records, such as goods receipts and rejection reports, not memory.

Example

A switchgear assembler scores two enclosure suppliers over a quarter. Supplier A delivers 92 per cent of lines on time with 1.5 per cent rejection. Supplier B is 5 per cent cheaper but delivers 71 per cent on time with 4 per cent rejection. The scorecard supports moving volume to A.

Records and checks

  • Record the measures, weights, period covered and source of each figure.
  • Verify delivery and rejection figures against goods receipt and quality records.
  • The purchase head prepares it, and the owner reviews it with major suppliers.

Common mistakes

  • Using too many measures, so no one can tell what is really wrong.
  • Sharing the score once a year with no action plan, so nothing changes.