Tapping
Tapping is the process of cutting an internal screw thread inside a drilled hole using a threaded cutting tool called a tap.
What it means
The hole is first drilled to a tap drill size slightly smaller than the bolt diameter. The tap is then turned or driven into the hole, cutting the thread. It can be done by hand, on a tapping machine or on a CNC machine. Tap breakage in a nearly finished part is a costly mistake.
Example
A fabricator needs M10 threaded holes in 100 mounting plates of 12 mm mild steel. The M10 coarse thread has a 1.5 mm pitch, so a hole of 8.5 mm is drilled first. After tapping, a go and no-go gauge checks the first plates.
Records and checks
- Record the thread size and pitch, tap drill size, depth, tap type, machine and number of holes tapped per tap.
- Verify thread quality on the first piece and periodically with a thread gauge.
- The operator gauges the holes, and the supervisor replaces taps before they are fully worn.
Common mistakes
- Using the wrong tap drill size, which gives a loose thread or breaks the tap.
- Tapping without coolant or cutting oil, so the thread tears and the tap wears early.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →