Test turnaround time
Test turnaround time is the elapsed time between a lab receiving a sample, or the patient ordering a test, and the report being released.
What it means
Doctors and patients plan around it, so labs promise times such as 4 hours for a blood count or 24 hours for a culture start. It has stages: collection, transport, accession, testing, verification and release. Measuring each stage shows where delay happens, which is often in transport or waiting for verification, not the machine. Urgent tests are tracked separately.
Example
A lab promises thyroid reports by 6 pm for samples received before 11 am. A review shows that 30 percent of late reports were waiting for pathologist sign-off after 5 pm, so a second verifier is added in the evening and on-time delivery improves.
Records and checks
- Record timestamps for collection, receipt, testing complete, verification and release, per test.
- Verify the clock times on the system against actual receipt, and separate urgent from routine tests.
- The lab manager reviews the average and the late tail weekly by test and stage.
Common mistakes
- Measuring from the time the report was printed, which hides waiting time earlier on.
- Quoting the average only, when a few very late reports upset the most patients.