Thread consumption
Thread consumption is the length of sewing thread needed to make one garment, worked out from seam lengths, stitch type and an allowance for wastage.
What it means
Each seam uses a multiple of its length, depending on the stitch: a plain lockstitch uses less than a chain stitch or an overlock with several threads. The factory adds up the use for every seam and adds wastage for tails, breaks and thread left on cones. It decides how many cones to buy for an order and makes a useful target for control.
Example
A shirt is estimated at 150 metres of thread. For 6,000 shirts the order needs 900 km, or about 100 cones of 9,000 metres. If actual issue is 115 cones, the factory looks for broken thread and stitch length errors.
Records and checks
- Record seam lengths, stitch types, thread per garment and wastage allowance.
- Verify actual cones issued and returned against pieces sewn.
- Stores issues thread; the line supervisor and merchandiser review variance.
Common mistakes
- Using one figure for every style, regardless of stitch type.
- Not reclaiming partially used cones from the line.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →