lamp.
ResourcesPricingAbout

Throughput

Throughput is the quantity of good output a process or factory completes in a stated period, such as units per hour, tonnes per shift or orders per day.

What it means

It counts what actually comes out, not what the machine could do on paper. Only good units count, not rejects or rework. Throughput is limited by the slowest step, so raising it usually means finding and relieving that step. Some businesses also use the word for money: the revenue earned minus the material cost of what was sold in the period, as a measure of what the operation really contributes.

Example

A Nagpur dal mill is rated at 2 tonnes an hour, but over one 8-hour shift it produces 11.2 tonnes of packed dal after stoppages and 0.6 tonnes of rejected output. The actual throughput is 10.6 tonnes in 8 hours, or about 1.3 tonnes an hour, well below the rated figure.

Records and checks

  • Record good output per shift, hours worked, stoppage time and reject quantity.
  • Verify counts against packing or dispatch records, not only machine counters.
  • The production supervisor records it each shift; the plant head reviews the weekly trend.

Common mistakes

  • Counting output before inspection, so rejected units inflate the figure.
  • Judging throughput by machine rating instead of measured results.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →