Throughput rate
Throughput rate is the quantity of good output that a machine, line or process completes in a given period of time, such as units per hour or tonnes per shift.
What it means
It tells you how fast a process really delivers, and it is set by the slowest step in the line. Rated speed on the machine nameplate is the ceiling, while throughput is what actually comes out after stoppages, changeovers and rejects. Using it, planners can estimate how long an order will take and spot the step holding everything else back.
Example
A bottling line is rated at 3,000 bottles an hour. Over an 8-hour shift it produces 19,200 good bottles, a throughput rate of 2,400 an hour or 80 percent of rated speed. The shortfall comes from two stoppages and one changeover.
Records and checks
- Record the good units produced, the running time and the stoppage time by cause.
- Verify the counts against the packing or finished goods tally at the end of the shift.
- The shift supervisor records it, and the plant head compares it with rated speed weekly.
Common mistakes
- Counting rejects as output, which inflates throughput.
- Planning on the rated speed instead of the throughput actually achieved.