Ticket severity
Ticket severity is the measure of how serious a reported fault is in its effect on the product or service, from a minor irritation to a complete failure or safety risk.
What it means
Severity is about the problem, while priority is about the order of work. A crack in a decorative panel is low severity. A machine that cannot start is high severity. Severity levels are defined in advance, with examples, so staff classify consistently.
Example
A lift service company defines severity 1 as a lift stuck with people inside or a safety failure, severity 2 as a lift out of service, and severity 3 as noise or a slow door. A ticket for a jammed door with a stuck passenger is severity 1 and is sent to the nearest engineer immediately.
Records and checks
- Record the severity level, the fault description, the evidence and the person who classified it.
- Verify that levels are applied by the written definitions, and recheck after the engineer sees the fault.
- The service engineer or lead assigns it and the manager reviews wrongly classified tickets monthly.
Common mistakes
- Letting customers pick the severity, so loud complaints are rated higher than real faults.
- Treating severity and priority as the same field in the ticket.