Tonnage

Tonnage is the rated clamp force of a moulding or press machine, stated in tonnes, indicating the largest job it can hold shut under pressure.

What it means

Machines are sold by tonnage, such as a 90-tonne or 250-tonne injection machine. A rough rule is that the clamp force needed rises with the projected area of the part and the cavity pressure, so bigger or more cavities need more tonnage. A machine too small flashes, while one far too large wastes power and is costly to run. Tonnage is one of several checks, alongside shot size and mould space.

Example

A moulder has a new mould whose parts and runners project over about 400 cm2 and need around 90 tonnes of clamp force. The shop has a 100-tonne and a 250-tonne machine. The planner picks the 100-tonne, which has enough force and costs far less per hour than the 250.

Records and checks

  • Record each machine's rated tonnage, the force needed by each mould and the machine it runs on.
  • Verify, before booking a job, that the mould fits the platen and that tonnage and shot size are within the machine's limits.
  • The planner proposes the machine, the setter confirms during setup, and the supervisor reviews any job near the limit.

Common mistakes

  • Running a mould near the machine's maximum, which strains the tie bars and the mould.
  • Choosing the biggest machine for every job, which raises cost per hour for no gain.