Tool life

Tool life is the amount of work a cutting tool can do before it must be replaced or resharpened, usually counted in pieces, cutting minutes or length machined.

What it means

Tool life depends on the tool grade, the material being cut, speed, feed, coolant and machine rigidity. Shops use it to decide when to change a tool, to estimate tooling cost per piece and to compare suppliers.

Example

Insert brand A costs ₹180 and lasts 200 pieces, or ₹0.90 per piece. Brand B costs ₹260 and lasts 400 pieces, or ₹0.65 per piece. Even though B costs more upfront, it is cheaper per piece and needs half the changes.

Records and checks

  • Record the tool code, supplier, material and cutting parameters, pieces or minutes achieved and the cause of failure.
  • Verify tool life on at least three tools before treating a new brand or setting as better.
  • The tool crib keeper logs usage, and the production head reviews tooling cost per piece quarterly.

Common mistakes

  • Judging a tool by one lucky run instead of an average over several tools.
  • Ignoring that a change in material lot or coolant concentration has shortened tool life.