lamp.
ResourcesPricingAbout

Truck utilisation

Truck utilisation is the extent to which a truck's available time and carrying capacity are put to productive use, often shown as a percentage.

What it means

It has two sides. Time utilisation compares hours or days on the road carrying cargo with hours available, and capacity utilisation compares load carried with what the truck could carry. A truck waiting idle at a gate or travelling back empty drags both figures down. Owners of their own fleet and buyers of dedicated vehicles track it because fixed costs such as driver pay, insurance and instalments run regardless of load.

Example

A trader with one 9-tonne truck runs 20 days in a month, but only 14 are loaded trips averaging 6 tonnes. Time utilisation is 70 per cent of those days and capacity use is about 67 per cent per loaded trip.

Records and checks

  • Record trip dates, route, load carried, waiting hours and empty return legs.
  • Verify load figures against weighbridge or delivery records and days against driver logs.
  • The transport in-charge calculates monthly; the owner reviews idle days and empty returns.

Common mistakes

  • Counting a day as utilised when the truck only moved a few boxes.
  • Ignoring empty return trips, which silently double the cost of the loaded leg.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →