Turning
Turning is a machining process in which a single-point cutting tool removes material from a rotating workpiece to make cylindrical shapes, steps, tapers and threads.
What it means
It is done on a centre lathe or a CNC lathe, and the part is held in a chuck or between centres. Operations include facing, plain turning, grooving, boring and threading. Finish depends on speed, feed and tool nose radius.
Example
A shop turns 400 shafts from 25 mm round bar down to 22.00 mm, with a shoulder and a thread at one end. Each takes 3 minutes on a CNC lathe, and the operator measures the diameter every ten pieces to catch tool wear.
Records and checks
- Record the material, bar size, program revision, tooling, speed, feed and cycle time per piece.
- Verify the first piece fully and sample critical diameters during the run.
- The operator measures along the run, and the inspector approves the first piece and final lot.
Common mistakes
- Letting the tool wear without adjusting the offset, so diameters creep out of tolerance.
- Gripping a long thin bar with no tailstock support, which causes chatter and taper.