Virgin material

Virgin material is new plastic resin that has not been processed into a product before, in contrast to regrind or recycled plastic.

What it means

Virgin resin comes straight from the manufacturer in granule form, with a known grade, melt flow and properties. Recycled and reground plastics have been heated once or more and may vary in quality and cleanliness. Products for food contact, medical use, safety and many branded buyers need virgin material, or limit how much regrind can be added. Virgin material costs more, so using it only where needed saves money.

Example

A maker of baby feeding bottles must use virgin polypropylene on the buyer's order, but makes its own wash buckets with a mix of virgin and regrind. At ₹110 a kg for virgin and ₹60 a kg for clean regrind, a bucket of 400 g costs ₹44 in virgin only, and about ₹37 with 40 percent regrind.

Records and checks

  • Record the supplier, grade, lot number, date of receipt and which orders the lot was used for.
  • Verify the supplier's test certificate and keep the lot number linked to the product batch.
  • Stores receive and label, quality checks the certificate, and the planner ensures virgin-only orders are not mixed with regrind.

Common mistakes

  • Using regrind on an order that specifies virgin only, then facing a rejection or a claim.
  • Mixing lots of virgin material from different suppliers without a trial.