Volume discount

A volume discount is a lower unit price given when a buyer purchases a larger quantity or value, usually through defined slabs in a single order or over a period.

What it means

Selling in bulk saves the seller effort in handling, billing and delivery, and a share of that saving is passed to the buyer as a lower rate. Slabs set the steps, such as one rate up to 100 units and a lower one above. Some businesses apply the lower price to the whole order once the threshold is crossed, others only to the extra units. The rule must be stated before the order, so there is no confusion afterwards.

Example

A PVC pipe distributor charges ₹210 per length up to 200 lengths, ₹203 from 201 to 500, and ₹196 above 500. A contractor orders 600 lengths. If the slab applies to the whole order, the bill is ₹1,17,600; if only to extra units, it is ₹1,22,500 or so.

Records and checks

  • Record the slabs, whether they apply to the whole order or only extra units, and the period counted.
  • Verify that the final invoice uses the correct slab for the quantity shipped.
  • The sales head approves slabs; billing staff confirm the rule used on each large invoice.

Common mistakes

  • Not stating whether the lower price covers the whole order, causing disputes at billing.
  • Setting slab breaks so low that nearly every buyer qualifies and the discount gives nothing in return.