lamp.
ResourcesPricingAbout

Volumetric weight

Volumetric weight is a notional weight worked out from a package's dimensions, used by carriers to charge for the space a bulky parcel takes.

What it means

Couriers and air carriers bill on whichever is higher: actual weight or volumetric weight. The usual method multiplies length, width and height in centimetres and divides by a divisor set by the carrier, commonly 5,000 for couriers. A box of pillows may weigh 2 kg but be billed as 10 kg. Carriers publish their own divisor, so check it before quoting.

Example

A carton of 50 cm by 40 cm by 30 cm weighs 4 kg. Volume is 60,000 cubic cm, and divided by 5,000 gives 12 kg of volumetric weight, so the courier charges for 12 kg, not 4 kg.

Records and checks

  • Record carton dimensions, actual weight and the carrier's divisor for each parcel type.
  • Verify the billed weight by repeating the calculation on a sample of bills.
  • The dispatch lead keeps the carton master up to date; accounts disputes overcharges.

Common mistakes

  • Quoting freight to customers on actual weight only, then absorbing the bigger bill.
  • Using a different divisor from the carrier's, so estimates never match invoices.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →