Water meter
A water meter is an instrument fitted on a pipe that measures and totals the volume of water flowing through it, usually in kilolitres.
What it means
The meter turns water use into a number you can track. Utility meters at the property boundary are used for billing, while a business can add its own sub-meters on a borewell, a boiler feed or a canteen line to see where the water goes. A sub-meter shows which area is the heavy user and when a leak starts.
Example
A laundry fits a sub-meter on the washing line and another on the boiler feed. The washing meter shows 1,400 kilolitres in a month against the boundary meter's 1,900, so the rest is traced to a leaking boiler feed.
Records and checks
- Record the meter number, location, reading date and the reading in kilolitres.
- Verify that a meter is working by comparing sub-meter totals with the main meter, and have it tested if they differ widely.
- The maintenance head arranges calibration or replacement of faulty meters.
Common mistakes
- Taking readings from a stuck or broken meter that shows the same figure for weeks.
- Fitting the meter on the wrong side of a tank, so it measures refill instead of actual use.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →