Welder qualification
Welder qualification is a formal test, with a record, showing that a welder can make sound welds in a stated process, material, thickness range and position.
What it means
The welder makes a test weld following a welding procedure, and the sample is examined visually and often by bend or radiographic test. If it passes, a qualification certificate is issued within the limits of the test. Welding outside those limits needs a new test. Codes also expect the qualification to remain valid through regular welding activity.
Example
A boiler-parts fabricator hires a welder to weld 8 mm carbon steel pipes in the fixed position. The welder tests on a pipe sample, and the sample passes the examination. His certificate then covers that process and range, not stainless steel or thin sheet.
Records and checks
- Record the welder's name, identification, process, material, position, test date and result.
- Verify that the welder's certificate covers the job's process and thickness before assigning work.
- The welding engineer or inspector assigns the welder, and the quality head tracks expiry.
Common mistakes
- Putting a welder on a job outside the scope of his certificate because he is skilled.
- Losing track of when a welder last welded in the process, so continuity lapses.