Welding procedure specification

A welding procedure specification is a written document that lists the process, materials, joint, filler, preheat, current range and other variables to follow to produce a sound, repeatable weld.

What it means

It is usually backed by a procedure qualification record that shows a test weld made to those settings passed its tests. The specification covers a range of thicknesses and materials, and welders must stay within it. Customers and codes often ask to see it before fabrication begins, particularly on pressure, structural or lifting equipment.

Example

A tank maker welds 10 mm mild steel plate under a specification that names the process, wire size, shielding gas, current range, preheat and interpass limits. A welder sets amperage outside that range and the inspector stops the work.

Records and checks

  • Record the specification number, revision, material range, parameters and the qualification record supporting it.
  • Verify that the welding on the floor matches the specification each shift.
  • The welding engineer approves it, and the inspector audits the actual settings against it.

Common mistakes

  • Using a specification qualified for one thickness range on a job outside that range.
  • Keeping specifications in an office file while welders work from memory.