lamp.
ResourcesPricingAbout

Witness statement

A witness statement is a person's own account of what they saw, heard or did around an incident, written or recorded and confirmed by them.

What it means

Witnesses fill gaps that photographs and machine logs cannot. Good statements are taken separately, as soon as possible, in the witness's own words, and stick to what the person observed rather than their opinion of who is at fault. The investigator asks open questions and avoids leading ones.

Example

After a fall from a loading dock at a Kanpur depot, the investigator speaks to the driver and two loaders separately that same afternoon. Two say the dock edge was wet, and the third says the lights were off, which the electricity log later confirms.

Records and checks

  • Record the name, role, date, time, place of the witness and where they were standing.
  • Verify accounts against each other and against physical evidence.
  • The investigator collects and files them; a second person should read them for gaps.

Common mistakes

  • Gathering witnesses in one room so they hear and copy each other's version.
  • Writing the statement for the witness in the investigator's own words.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →