Work in progress

Work in progress is the material, labour and overhead cost of goods that have been started in production but are not yet complete.

What it means

Between the raw material store and the finished goods store there are items on the floor in various stages. They have absorbed material and effort but cannot be sold. Too much of it signals long queues and tied-up cash. It also affects accounts, as its value is counted as stock at the period end. Valuing it requires knowing how far each job has progressed.

Example

A Rajkot tool maker has 120 half-finished chisels at month end. Steel cost is ₹90 each and they are about 60 per cent through the process, with ₹50 of conversion cost for the full process. Value per piece is ₹90 plus 60 per cent of ₹50, or ₹120, so the work in progress is ₹14,400.

Records and checks

  • Record the job, quantity on hand, stage reached, material issued and conversion cost to date.
  • Verify by a physical count on the floor at period end against the job records.
  • The production supervisor counts and reports; accounts values it and the owner reviews the total.

Common mistakes

  • Leaving finished orders open, so completed goods are still reported as work in progress.
  • Skipping the count and using last month's figure, which misstates stock and profit.