Workmanship defect
A workmanship defect is a fault in a garment caused by the making process, such as skipped stitches, open seams, puckering or wrong measurements, rather than by the fabric.
What it means
Typical examples are broken or skipped stitches, uneven seams, twisted legs, loose threads, misplaced labels and stains from handling. Inspectors classify them as minor, major or critical, and the buyer's acceptance limit decides if a lot passes. Tracking where each defect is made helps fix causes, such as machine settings, an untrained operator or a poor method.
Example
In a final audit in Noida, 12 of 200 sampled shirts show skipped stitches on the collar. The quality head traces it to one machine's needle type, replaces the needles, and re-inspects the lot of 1,500 shirts.
Records and checks
- Record the defect type, operation, operator or machine, and quantity.
- Verify the defect count against the buyer's acceptance limit.
- The quality checker records them; the line supervisor fixes the cause.
Common mistakes
- Repairing defects at the end of the line without tracing their source.
- Blaming the operator without checking machine and method.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →