Design-to-launch: exception and recovery register

This register records everything that goes off plan between the product brief and the launch, such as a failed sample, a late supplier or a cost that crept up, and how each one was recovered. Project leads, quality staff and purchase staff use it so that problems are visible early and lessons are not lost once the launch is done.

When to use it

Log an item as soon as a result, date or cost moves outside what the project plan allows. Use it during design and trial, and again in the first month after launch when early customer feedback exposes faults.

The template

Part 1: common exception types and a standard recovery path.

Exception typeTypical causeFirst responseRecovery stepOwner
Sample failed a testMaterial or dimension offStop further trials with the same set-upFind the cause, change one thing, retestQuality lead
Change after the specification was fixedCustomer or owner request lateRecord the change and its cost and time effectApprove or hold with the owner's decisionProject lead
Supplier delaySupplier capacity or order gapAsk for a written firm datePlace a backup order or switch supplierPurchase lead
Cost above targetMaterial price rise, waste, extra stepRecalculate the cost per unitRework the design or reset the priceAccounts lead
Launch date slipCombination of the aboveTell everyone affected the new dateRe-plan tasks and confirm customer messagesProject lead
First-lot defectProcess not stableHold the lot and sort stockRework or scrap, then fix the processOperations head

Part 2: the register.

RefDate raisedProduct or serviceWhat happenedImpact in ₹Recovery planOwnerTarget dateClosed on
DX-001
DX-002

How to fill it

  • Ref: a running number, never reused.
  • What happened: write the observation, not the guess about the cause. The cause goes in the recovery plan once found.
  • Impact in ₹: include scrap, rework, extra freight, expedite charges and the margin lost if the price had to change.
  • Recovery plan: one or two concrete steps with a person against each.
  • Closed on: enter the date only after a retest or a delivered replacement proves the fix worked.

Example row

RefDate raisedProduct or serviceWhat happenedImpact in ₹Recovery planOwnerTarget dateClosed on
DX-00712 Oct 2026Steel tiffin set3 of 10 sample units leaked at the lid seam during the water test4,200 for scrapped samples and a second trialChange the gasket supplier, make 10 new samples, repeat the testQuality lead22 Oct 2026

Review and sign-off

  • The project lead reviews open lines every week and the owner signs the register at the launch decision.
  • Review weekly during the project and monthly in the first quarter after launch.
  • Escalate when the same exception type appears twice, when a line passes its target date, or when a fix needs spending above what the project lead can approve.

Keeping it up to date

  • Keep closed lines, since they are the best guide for the next launch's checks and costs.
  • At the end of the project write the top three causes and one preventive step for each.
  • Retain the register for the period your CA or the law requires, along with test records and supplier correspondence.