Asset criticality
Asset criticality is a ranking of how seriously a machine's failure would affect production, safety, quality, delivery and cost.
What it means
Not every machine matters equally. A single press that every product passes through is critical, whereas a spare drill or a second pump may not be. Owners rank assets, often as A, B and C, by considering impact of failure, availability of a standby and time to repair. High-criticality assets get closer inspection, preventive maintenance and stock of key spares.
Example
A bottling plant ranks its filling machine A, because it has no backup and stops output for the whole line. The labeller, with a manual fallback, is ranked B, and the office generator C.
Records and checks
- Record the criticality grade for each asset, the reasons and the date reviewed.
- Verify grades yearly or after a major change such as a new line or standby machine.
- The maintenance and production heads agree the grades; the owner approves spares budgets on this basis.
Common mistakes
- Marking every machine as critical, so priorities mean nothing.
- Grading once and never revisiting after the process changes.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →