lamp.
ResourcesPricingAbout

Beat plan

A beat plan is a schedule of the retail outlets a salesman will visit, area by area, on set days of the week or fortnight.

What it means

A beat is a fixed set of shops in one area. The plan says which beat is covered on Monday, which on Tuesday, so every shop gets a regular visit. It spreads effort across the market, avoids missing small outlets and measures every salesman on the same basis. Bigger shops may get a shorter gap between visits.

Example

A biscuit distributor in Indore divides one salesman's area into six beats of about 45 shops each. Palasia is Monday, Vijay Nagar is Tuesday. Large shops are visited weekly and small kirana shops every second week.

Records and checks

  • Record the outlets in each beat, the visit day and the planned frequency.
  • Verify through visit and order logs that the salesman followed the plan and did not skip distant or small shops.
  • The sales supervisor reshuffles beats monthly as shops open, close or change in size.

Common mistakes

  • Never updating the plan, so closed shops stay listed and new ones go unvisited.
  • Loading one beat with 80 shops so visits become rushed.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →