Bill of materials

A bill of materials is a structured list of every component, raw material and quantity needed to make one unit of a finished product.

What it means

Think of it as the recipe for a product. It names each item, its quantity per unit, the unit of measure and often allowances for wastage. Planning uses it to work out what to buy for an order, stores uses it to issue material, and costing uses it to find the material cost of each unit. A wrong list gives wrong purchases, wrong stock and wrong cost, so it deserves care.

Example

A Jaipur furniture maker's bill for a study table has 1 top of 18 mm plywood (1.1 sq m), 4 legs of 40 mm square pipe at 0.72 m each, 12 screws, 1 can of lacquer at 0.15 litre and 2 edge bands. For 30 tables, planning multiplies each line by 30 and adds wastage.

Records and checks

  • Record the parent item, each component, quantity, unit, wastage allowance and revision.
  • Verify actual consumption against the list after a few batches, and correct differences.
  • The engineering or planning head owns it; stores and costing confirm they use the same version.

Common mistakes

  • Leaving out small items such as packing, labels and consumables, so cost is always understated.
  • Not updating it after a design or supplier change, so planning buys the wrong parts.