lamp.
ResourcesPricingAbout

Break-even volume

Break-even volume is the number of units that must be sold to cover all costs, found by dividing total fixed costs by the contribution margin per unit.

What it means

It tells a producer how many pieces must go out the door before profit begins. Contribution per unit is the selling price less the variable cost per unit. The answer is useful in judging whether a new product, a new machine or a lower price is worthwhile, because a lower price shrinks the contribution and pushes the volume needed higher. It assumes price and variable cost stay constant across the range.

Example

A plastics firm buys a new mould for a bucket line with fixed costs of ₹90,000 a month. Each bucket sells at ₹95 with variable costs of ₹65, giving ₹30 contribution. The break-even volume is 90,000 divided by 30, which is 3,000 buckets a month.

Records and checks

  • Record fixed costs for the period, the selling price and the variable cost per unit, along with the source of each figure.
  • Verify the variable cost includes material, direct labour paid per piece, packing and freight.
  • The costing accountant calculates, the production head confirms capacity, and the owner decides whether the volume is realistic.

Common mistakes

  • Leaving out packing and freight from variable cost, so the contribution looks higher than it is.
  • Setting a volume that exceeds the plant's capacity and not noticing.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →