Compressed air leak
A compressed air leak is air escaping through damaged pipes, hoses, couplings or valves, wasting the electricity spent to compress it.
What it means
Compressing air is expensive, so every leaking hole keeps the compressor running to replace the lost air. A leak is small to the eye but runs for all the hours the system is pressurised, including nights and holidays when nothing is being produced. Common sources are worn hose clamps, quick couplings, drain valves left slightly open and tools with worn seals.
Example
A plastic moulding unit in Daman notices its compressor runs through a Sunday shutdown. Walking the lines, the maintenance team finds a split hose and two stuck drain valves. After repair, the compressor shuts off during idle hours and the electricity reading drops.
Records and checks
- Record where leaks occur, the part that failed, the date found and the date repaired.
- Verify that the compressor unloads in non production hours; if it does not, leaks remain.
- The maintenance supervisor does a weekly walk, and the manager reviews repeat failure parts.
Common mistakes
- Treating small hissing as normal noise on the shop floor.
- Raising the system pressure to cover the leak, which increases the loss.