Compressor load
Compressor load is how much of its capacity a compressor is delivering, often shown as the share of time it runs loaded rather than unloaded.
What it means
A compressor in a fixed speed set works in two states. Loaded, it makes air at full power; unloaded, it spins without making air but still draws a substantial fraction of full power. High unloaded time means the compressor is oversized or air demand is low. Constant loaded time may signal leaks or a compressor too small for the plant. Both cost power.
Example
A 30 kW compressor in a textile mill in Erode runs loaded 55 percent and unloaded 45 percent of the time. Each unloaded hour still draws roughly a third of full power. The owner investigates a smaller compressor or a variable speed unit.
Records and checks
- Record loaded and unloaded hours from the controller, with kWh from a meter, by week.
- Verify the numbers against production hours and note any unusual jump in loaded time.
- The maintenance head reviews trends monthly and the owner decides about resizing.
Common mistakes
- Running two compressors partly loaded when one could do the work.
- Ignoring a rise in loaded hours when output is flat, which usually points to a new leak.