Consignment

A consignment is a quantity of goods sent from one consignor to one consignee under a single transport document, even if it spans several packages.

What it means

In transport, a consignment is what the carrier booked as one job: one sender, one receiver, one document such as a lorry receipt. It may hold many cartons but is tracked and billed together. The word has a second meaning in trade, where goods are placed with an agent who sells them for the owner and pays after sale. Check which sense is meant.

Example

A steel fabricator sends 32 pipes and 6 bundles of sheets to one site in Nashik on a single truck. That is one consignment under one lorry receipt, though it has 38 pieces of different items.

Records and checks

  • Record consignment number, consignor, consignee, package count, weight and the invoices it covers.
  • Verify the received package count at destination against the document before signing.
  • Dispatch owns the record at origin; the receiving store signs and returns proof of delivery.

Common mistakes

  • Putting goods of two customers under one consignment, which makes shortage claims messy.
  • Not linking the consignment to its invoices, so payment follow-up cannot confirm what was delivered.