lamp.
ResourcesPricingAbout

Consignment note

A consignment note is the transport document issued by a carrier for a consignment, recording sender, receiver, goods, quantity, freight and terms of carriage.

What it means

It is the carrier's proof that it received the goods and will deliver them, and often the contract evidence between sender and carrier. In India road transporters call theirs a lorry receipt or bilty. It normally carries a serial number, date, party details, goods description, package count, weight, vehicle number and payment basis. Buyers and insurers rely on it.

Example

A spice trader hands 50 sacks of turmeric to a transporter in Erode. Note number 4821 records 50 sacks, 2,500 kg, destination Mumbai and freight of ₹21,000 payable by the sender.

Records and checks

  • Record the note number and date alongside invoice number, package count and freight.
  • Verify description, count and weight on the note against what was physically loaded.
  • The dispatch clerk checks it before the vehicle leaves; accounts files it with the transporter's bill.

Common mistakes

  • Letting a note be issued after the vehicle has left, with no check of the load.
  • Accepting a note that omits the invoice or vehicle number, which weakens any claim.

Check the current rule on the official portal or with your CA before acting.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →