Constraint management
Constraint management is the practice of finding the one factor that limits a business's results and organising work so that it is used fully before anything else is improved.
What it means
Every business has at least one limit: a machine, a skill, a supply, demand or a policy. The method works in a repeating cycle: identify the constraint, make the most of it with what you have, line up other work behind it, then lift it by investing if needed, and look again because the limit may have moved. It prevents effort being wasted on improvements that do not change results.
Example
A Vadodara packaging firm finds its printing press is the limit, running at 70 per cent because of long colour changeovers. It groups jobs by colour, prepares plates in advance and stops low-margin jobs from using the press. Without buying anything, the press moves up to 85 per cent and weekly output rises by 18 per cent.
Records and checks
- Record the identified constraint, its current output per hour and the actions taken to protect it.
- Verify the improvement by comparing output before and after, and check where the limit moves next.
- The owner or plant head leads the review; supervisors confirm the constraint is never left idle.
Common mistakes
- Naming too many constraints, which spreads attention without fixing any.
- Stopping after one improvement, without checking where the new limit has appeared.