Cost centre
A cost centre is a department, location or activity for which costs are collected and reported separately, so that someone can be held answerable for its spending.
What it means
It does not earn revenue of its own in the books; it only incurs costs, such as the maintenance team, the stores or head-office accounts. Splitting costs by centre shows where money goes and who controls it. Costs shared across centres, like rent or power, are often divided using a sensible basis such as floor area or machine hours.
Example
A plastics factory tracks monthly cost for moulding, packing, maintenance and admin separately. Maintenance cost jumps from ₹60,000 to ₹95,000 in one month, and the manager traces it to a mould repair.
Records and checks
- Record: a code and name for each centre, its manager, and every expense tagged to one centre.
- Verify: that bills are tagged to the correct centre and the centre totals equal the overall expense total.
- Checked by: the centre manager explains variances; the accounts head reviews the tagging each month.
Common mistakes
- Creating too many centres, so that tagging every bill becomes tedious and gets skipped.
- Dumping unexplained costs in a "general" centre nobody owns.