Cost-plus pricing is a method of setting a selling price by adding a fixed percentage or amount to the full cost of making or buying the product.

What it means

The seller works out the cost, including materials, labour and a share of overheads, and adds a margin to reach the price. It is simple, easy to explain to customers and common in job work, contract manufacturing and quotations. Its weakness is that it ignores competition and what the customer is willing to pay, and it depends on an accurate cost, which is hard when overheads are shared.

Example

A fabrication shop estimates a gate at ₹8,000 in materials, ₹3,000 in labour and ₹1,000 in overheads, a total of ₹12,000. Adding a 25 percent margin gives a quote of ₹15,000. A rival offers ₹13,500, so the owner checks whether the cost can be lowered before deciding.

Records and checks

  • Record the cost build-up by item, the margin added and the reason for choosing it.
  • Verify that the cost includes all direct costs and a fair share of overheads, and update it when input prices change.
  • The estimator prepares the quote, the owner approves the margin, and the accountant compares quoted and actual costs after the job.

Common mistakes

  • Using an old cost sheet when material prices have risen, which quietly cuts the margin.
  • Adding the same margin to every item, though some can bear more and some less.