Cp

Cp is a capability index equal to the tolerance width divided by six standard deviations of the process, showing whether the process spread fits the tolerance.

What it means

It answers a narrow question: if the process were perfectly centred, would its natural variation fit inside the specification limits? A Cp of 1.0 means the spread just equals the tolerance, and higher is better. Because it ignores where the average sits, a process can show a good Cp and still produce bad parts if it drifts off target.

Example

A bore must be 40.00 mm plus or minus 0.05, a tolerance width of 0.10. Measured over 50 pieces, the standard deviation is 0.012 mm, so six sigma is 0.072. Cp is 0.10 divided by 0.072, about 1.39.

Records and checks

  • Record the specification limits, the sample size, the measurement method and the standard deviation.
  • Verify that the process was stable, with no trends or shifts, when the data was collected.
  • The quality engineer calculates it, and the production head reviews it with the customer if needed.

Common mistakes

  • Quoting Cp alone and ignoring the mean, which can sit near a limit.
  • Calculating it from too few pieces or from one operator's best hour.