Cutting allowance

Cutting allowance is the extra length or width of material added to a part's finished size to cover the cut width, end trimming and finishing, so the part reaches its size.

What it means

When you cut a bar or sheet, the saw or torch removes some material, and the cut ends are often rough or uneven. A cutting allowance covers this loss. The amount depends on the cutting method and the material.

Example

A fabricator needs 40 pieces of 500 mm length from 25 mm round bar using a hacksaw. With a 3 mm allowance per cut for blade width and facing, each piece is cut at 503 mm, and a 6-metre bar gives 11 pieces.

Records and checks

  • Record the part length, allowance used, cutting method and the number of pieces yielded per stock length.
  • Verify the first cut piece with a tape or caliper and check that the allowance is consistent across lots.
  • The cutting operator measures, and the planner uses the same allowance when working out material needed.

Common mistakes

  • Forgetting the allowance in the material estimate, so the shop runs out of stock before the order is complete.
  • Adding the same allowance for laser cutting and band saw cutting, which waste different amounts.