Cycle time

Cycle time is the time taken to complete one unit of work, either at a single operation or from the start to the end of the whole process.

What it means

At a machine, it is the time from one part finishing to the next part finishing, including loading and unloading. Across the whole process, it is how long a unit takes from start to finish, including waiting. Measured honestly with a stopwatch over many cycles, it shows the real pace of the work. It is used to plan capacity, to find the slowest step and to compare against the rate the customer needs.

Example

A bakery in Vadodara times its bun-moulding station. One tray of 24 buns takes 3 minutes 20 seconds including loading, so the cycle time is 200 seconds, or about 8.3 seconds per bun. At that pace, one shift of 7 hours of running can produce about 3,000 buns, not the 4,000 the owner believed.

Records and checks

  • Record time for at least ten cycles per operation, including normal pauses, and the date measured.
  • Verify the timing is of the actual method and operator, not of the best or the rehearsed one.
  • The supervisor measures it; the planner uses the figures after the production head confirms them.

Common mistakes

  • Timing only the machine's automatic cycle and leaving out loading, clamping and unloading.
  • Using the best run as the standard, so schedules always fall behind.