Demand charge
A demand charge is the fixed portion of an electricity bill based on the highest power demand, in kVA or kW, rather than on the units consumed.
What it means
Utilities must build capacity for a customer's peak, so they bill for it. Besides the energy charge per unit, the bill carries a charge per kVA of demand, on the basis the tariff states. One brief spike can raise the whole month's bill.
Example
A cold storage unit in Hapur has an energy bill of ₹1,20,000 for its units and a demand charge of ₹36,000 on 120 kVA. A compressor start up spike pushes recorded demand to 140 kVA and the demand charge rises to ₹42,000.
Records and checks
- Record the demand charge rate, billed demand, recorded demand and the amount each month.
- Verify the billed demand against the meter's maximum demand reading and the tariff terms.
- The electrical in charge examines peaks and the owner decides on load staggering.
Common mistakes
- Starting several large motors together, which creates avoidable peaks.
- Looking only at the energy rate and ignoring the fixed demand portion.
Check the current rule on the official portal or with your CA before acting.