Design FMEA

A design FMEA is a structured review of how a product's design could fail, what the user would experience, and what design action will reduce each risk.

What it means

The team lists the functions of the product, then for each one asks how it could fail, how serious the effect would be, what could cause it and how likely and detectable it is. These ratings give a risk score that helps rank where to act first. It focuses on the design itself, such as material choice, tolerances and strength, not on how the part will be made, which a separate process analysis covers.

Example

For a portable water pump handle, a Rajkot team asks how it could crack. The cause is a thin welded joint under repeated load. Severity is high because the pump would stop. They thicken the joint, change to a stronger rod and add a bend test on prototypes before drawings are released.

Records and checks

  • Record each function, failure mode, effect, cause, rating and the design action taken.
  • Verify that completed actions are re-scored and that high-risk items are closed before design release.
  • The design engineer leads; the quality and production heads review before sign-off.

Common mistakes

  • Filling it in after the design is frozen, so it records risks instead of reducing them.
  • Giving every item a middling score, which hides the few risks that truly matter.