Design input
Design input is the set of requirements, such as function, performance, safety, limits and standards, that a design must satisfy before design work begins.
What it means
These are the starting conditions for the designer: what the product must do, in what conditions, within what cost and size, and to which standards. Good input is specific enough to be checked later. A vague line such as "should be strong" cannot be proved, while "must carry 150 kg without permanent bend" can. Everything the design produces is later compared back to these inputs.
Example
A Hyderabad firm designing a folding trolley writes its input as follows: loads up to 80 kg, weighs under 6 kg, folds to 25 cm thick, survives 10,000 fold cycles, and costs under ₹1,400 to make. The designer now has measurable targets for every choice.
Records and checks
- Record each requirement with its value, unit, source and the date it was agreed.
- Verify that no requirement is vague, contradictory or missing a way to measure it.
- The product owner and designer review together; the customer or sales head confirms it matches the need.
Common mistakes
- Writing wishes instead of measurable limits, so no one can say whether the design passed.
- Starting design with unresolved conflicts, such as low cost and high durability, left for later.