Design validation
Design validation is the confirmation, usually by testing under real or realistic use, that the finished product meets the needs of the user it was designed for.
What it means
Verification asks whether you built it to the specification. Validation asks whether the specification was the right one: does it work for the person who will use it? So validation uses representative units, real or simulated conditions and, where possible, real users. A product can pass every drawing check and still fail because it was never tried in actual use.
Example
A Coimbatore firm builds a hand-operated groundnut sheller. Dimensions all match the drawing, which is verification. For validation, five farmers use it for two days in the field with damp pods. Jamming appears in damp conditions, so the feed opening is widened before production.
Records and checks
- Record the test conditions, users or samples, results and any problem observed.
- Verify that the units tested are the final design and that the conditions resemble real use.
- The product lead runs it; the customer or an independent user confirms the findings.
Common mistakes
- Testing only in the factory under ideal conditions, so field problems appear after launch.
- Treating a successful verification as proof of validation, skipping the user trial.