Design review
A design review is a planned, documented evaluation of a design by people from different functions to find problems and decide whether it is ready for the next stage.
What it means
It is not a casual chat over a drawing. The review has an agenda, the right people, the current documents and a clear question: can we go ahead? Production, purchasing, quality and sales each bring different concerns. A supplier may notice the part cannot be sourced, while a shop-floor lead may see it cannot be clamped. Actions arising from the review are recorded and followed to closure.
Example
Before releasing a new stainless water tank design, a Pune team meets for 90 minutes. Production says the weld access on one corner is too tight. Purchasing notes that 1.2 mm sheet has a 5-week lead time. Both points are logged as actions, with owners and dates.
Records and checks
- Record attendees, documents reviewed, decisions, actions, owners and due dates.
- Verify that each action is closed, or consciously carried forward, before the next stage.
- The project lead chairs it; the owner or quality head signs the release decision.
Common mistakes
- Inviting only the designers, so manufacturing problems appear on the shop floor later.
- Recording the meeting but never tracking the actions, so the same issue returns in the next review.